范文为教学中作为模范的文章,也常常用来指写作的模板。常常用于文秘写作的参考,也可以作为演讲材料编写前的参考。那么我们该如何写一篇较为完美的范文呢?接下来小编就给大家介绍一下优秀的范文该怎么写,我们一起来看一看吧。
工程监理自我评价 监理自我评价100字左右篇一
first, obey the leadership arrangements, conscientiously perform their jobs
1, to receive the relevant departments of higher authorities issued a variety of information, documents, the timely registration, archiving, and distributed to the relevant units or inspaniduals.
2, on time to complete the transmission of engineering information, when the construction unit received a variety of information submitted, the timely classification and preliminary review of the qualified information in a timely manner distributed to the project director and the professional supervision engineers to sign; for the unqualified materials, timely return to the construction unit requires its complement, modify, improve and re-report to the ministry of supervision, according to the procedures for the processing of documents; documents have been sent and received registration, and the establishment of a complete account.
3, the completion of the ministry of supervision of the word processing, sorting the minutes, to participate in supervision of monthly, details of the preparation work.
4, to assist the supervisory engineer to the scene acceptance of each process, if not meet the design, specification requirements, supervise the construction site staff timely rectification and related inspection work.
second, regulate their own words and deeds, improve project management level. the project director arranged for me to go to the construction site
line supervision work, and arranged a professional knowledge of the engineers take me. mainly to assist civil engineers to supervise the construction process, project acceptance and is responsible for the next station. at the beginning of the construction site, i actively approached the owners and communicated with the construction unit, carefully studied the relevant specification requirements and viewed the engineering drawings. with the careful supervision of the professional supervision engineers, i became familiar with the relevant regulations and requirements of some design drawings.
in the civil construction of concrete pouring construction, the project involves a number of key parts of the process, once negligence may cause engineering quality accident, so in the next station construction, strengthen the monitoring, strict supervision of various parts of the construction, strengthen the construction process control, construction units in strict accordance with the design requirements, construction plans and acceptance criteria for construction, to ensure the quality of the ision records are an indispensable link in project supervision, in the field inspection, parallel inspection process, i do a detailed record every day, have a complete supervision of the log, as well as next to the station records.
in the construction of the bypass station, it is necessary to clarify the location of the casting components, the strength of the concrete grade and the mixing method of the concrete, whether the management personnel of the construction unit are in place, the construction machinery and raw material reserve status, the pouring start time and the end time. quantity, concrete test block production group, the slump of the design requirements and the actual sampling results. in the construction of key parts of the project, to arrive ahead of time to arrive at the station location, check the construction preparation work, the whole process of station supervision, timely and real written written record of the station; the construction of the procedures to do daily operations of the supervision, inspection work. timely notify the construction unit or the supervising engineer to discover the problem and report the matter to the supervisor in time. and urge the construction unit to implement the rectification and compliance, the re-examination to confirm again. in the construction site, due to the lack of professional knowledge and work experience, although i encountered many problems, but i still stick to their posts, do the due diligence should do the work, with an open mind to learn, and gradually improve themselves and continuously improve business management.
third, strengthen the daily learning, and strive to improve the quality of their business. the professional quality is the basic condition for the supervisor to fulfill his duty.
as a young supervisor, i love my profession, often familiar with the specification, the standard atlas, and a lot of reading the professional books, keen on the accumulation of work experience.
fourth, dedicated performance, and serve as a good staff as a supervisor, there is no interest to seek
and the right to enjoy the treatment, only the responsibility to take the lead in the work of the obligation. in the usual work, the work assigned by the leadership, the quality and quantity to complete; of their own work within the can also be actively treated, and strive to complete, do not offside, but also in place, but not dereliction of duty. always adhere to the standards of a qualified supervision staff requirements of their own, love their own work; a good work style and hard-working spirit; work attitude, the completion of the supervision department to the various tasks. in the work of the high standards of their own, strict compliance with their duties, found that the problem in accordance with the situation and make timely reports to the leadership. in daily life, to respect the leadership, unity of colleagues, to help difficult colleagues to solve life and work problems.
工程监理自我评价 监理自我评价100字左右篇二
to this end, now the fourth quarter engineering work summarized as follows:
first, the schedule of progress
in the early stage of construction, under the consistent efforts of the whole company, the whole works well and the project has a good trend from safety, quality and progress. however, the processing of raw materials is an important link. , the audit of its materials related to the acceptance of the project safety, progress and other major links. (materials often problems: 1, the material does not match the original drawings. refer to the drawings one by one inspection to ensure that the material is correct; followed by raw materials in the production process to increase its efforts to monitor the company to ensure the correct production of materials for the do not need to do a good job guarantee .2, raw materials approach the corresponding information is not perfect .it is recommended in the process of distribution of materials, the organization of the corresponding information staff to prepare the appropriate information on the vehicle distribution .3, good drawings review, the original design of common sense i would like to set up the company before the corresponding set of leadership, design, materials, engineering (recommended construction team in the conditions permitting, in the event of the construction site, the meeting will be responsible for the corresponding person in charge of a "pre-conference" for the drawings, contracts, raw materials collection, material distribution co-ordination, design technology, on-site management issues to do a full range of analysis, co-ordination, responsibilities, unity team strength.
in the foundation construction, the weather and other irresistible factors, is affecting the overall project successfully completed the biggest stumbling block, for this site managers should be based on the actual situation of the site, party, weather and other factors to do the appropriate adjustments, reasonable arrangements for the construction schedule, effective measures to catch up with the progress of the system. in this, i also deeply aware of their own shortcomings, the face of rainy weather can not reasonably organize workers to do the preparatory work for the latter part of the progress of the work, the corresponding conditions permitting the corresponding time delay caused by the progress of the project to step up , the corresponding surprise overtime is my own lack of management experience, can not be reasonable and effective deployment of workers to fully implement, so in the future work there are many places need to learn to grow.
second, the construction safety
site construction to be able to truly realize that production safety is a business and personal casting too fine in the premise and protection. we can realize the social attitude of "people-oriented, safety first", and can realize the importance and necessity of safety facilities, safety education and prevention. in the early stage of construction, do a good job of worker safety education, the signing of the corresponding labor contract, the security at the end, always bear in mind safety awareness, reserved warehouse project midway construction workers in the process of fall, as the scene responsible for people i can not shirking responsibility, in the company's leadership under the same concerted efforts to take appropriate emergency measures for the injured in a timely and effective fight for the most valuable time to rescue, making the final health recovery workers to provide a strong guarantee for this i also reflect on their own deep, in the future construction site safety management work, always do a good job "sambo, four, five edge", the construction of civilization, the safety education of workers, investigation of security risks as the focus of the work and the development of specific security implementation of programs and measures for the smooth conduct of escort the project.
third, the construction quality
a hundred years, quality-oriented. project, with the already completed, but still left a lot of thorny issues, such as: roof tile sun lap at the water leakage, wall windows leaks ... ... to the party's production has caused some impact, but also for the company the unnecessary loss, which i am deeply guilty, has been working to repair. in view of the above, i think in the construction process of the construction process to monitor their time, to avoid the workers paralysis thinking, to work with the team signed a technical agreement, if necessary, the quality of the agreement signed and develop the appropriate quality inspection cycle, found in the construction process quality defects the implementation of the implementation of the settlement, and truly quality problems in the dynamic management of quality inspection within. in strict accordance with national norms, standards and household acceptance criteria for the construction, the quality of the implementation.
工程监理自我评价 监理自我评价100字左右篇三
as a graduating student this year, i am honored to join this company, and today my probationary period has been over 3 months, and in the past three months, i initially worried about graduating as a new member of societystudents can not get along well with people, how to do their own work, but in this company, where the leadership, where my colleagues gave me great help in the company harmonious working atmosphere, solidarity in the corporate culture , so i am very easy to change from a student into a qualified social professional. thank you, colleagues and leadership here.
since joining the company in september of this year, my practical work experience is basically zero, only the theoretical knowledge of the school professor, when i first came into contact with the supervision work, i was not surprised, because the actual work and there is a big difference between the textbooks. i have been very confused, but some of my colleagues under the guidance of patience, i quickly adapted to the site of the work environment, but also understand the work of a project supervisor responsibilities.
in the work of the site supervision, i am strict with myself, do not let any details of the project, so that everything must personally check the principle of access to the company colleagues and leaders of the recognition, but also access to the construction unit recognition, professional knowledge and practical aspects of the work, the problems encountered, humbly ask colleagues to continue to enrich themselves, to contribute to the company.
in the supervision of the work, as a new graduate into the community, there are a lot of small difference, these experiences make me continue to grow, in dealing with various problems at the same time, so that their knowledge of the surface continue to expand, consider the issue more comprehensive, to avoid the same problem in the future. i would like to thank my colleagues who have contributed to the mistakes and reminders and guidance of my work.
after three months of work, i now have to be able to independently deal with some of the engineering problems, the normative work drawings are also very familiar with, you can draw their own drawings and analysis judgment on the engineering procedure. of course, i have a lot of problems, in dealing with the relationship between the construction unit needs to be further improved, the group cooperation is relatively poor, need to work in the future to further improve their ability.
after three months of work, i am in this company to work pride and pride, more hope to become a member of the company, to achieve their goals in life, reflect their value in life. i will be humble attitude and full of enthusiasm to do my own work for the company to create value, with the company to show a better future!
工程监理自我评价 监理自我评价100字左右篇四
unconsciously, 20xx years has been in the mature and confused intertwined, quietly passed. in my eyes, the design room is also a no smoke of the battlefield, it can temper people's will, indifferent to the soul, the quality of business can be rapidly improved, people can quickly mature the psychological, which all condensed with each leader english name decision and correct guidance.
end of the year when the end of the year, people are always lamenting the life of the waste, look back and look forward to two eternal theme will be unchanged. here i will from the quality of business, external communication and internal cooperation in two major aspects to analyze their gains and losses over the past year.
as a professional architectural design staff, the improvement of business ability is the most important.
20xx years of six months, drawing through a large number of construction drawings, architectural design of the process, methods have a deeper understanding of the building code also has a certain understanding. at the beginning of this year, i set myself the goal of having the ability to operate a general project independently, including its overall planning, program design, renderings, and post-construction drawings. ability comes from practice, practice test ability; in the fourth quarter, i follow their established goals step by step to come down to earth, some may be achieved, and some may be away from the target there is a certain gap, specifically in the following aspects.
first, the overall planning capacity:
20xx in the second half of the year, through a residential district of pixian total planning, nanchong a fund-raising room of the total flat design, zhengxing a commercial center of the total flat adjustment and a downtown commercial and residential area of the overall plan, the knowledge has a more profound understanding, have a certain ability. in order to facilitate communication with party a, i strive to learn more about the real estate development trends and trends, intentions speculation developers business purposes, and strive to find the perfect combination of designers and developers point. as a designer, mainly through the national norms and the local government departments to determine the volume rate, building density, green rate, building height and spacing to macro control; secondly, the basic column network to determine the fire channel and residential road network through building style selection is also a mature designer must be skilled to solve several problems. i pay special attention to these issues at work, and properly handle the problems encountered on the modest leadership and senior experts to consult, and achieved good results, and accumulated a lot of valuable experience.
second, the performance of the map:
the effect diagram as a means of expression, is the most intuitive expression of architectural design work, which determines the overall style of the building, but also decided to choose the package of developers a very important reason, so i think the performance of the performance of architectural design the early very important components also make me a basic skill that must be mastered. over the past year, through the garrison of the guest house, a building attached to flyovers, forgetting valley hotel and a villa renderings renderings, i am able to master the 3dmax, ps / 'target = blanks> photoshop and other design software to be their understanding of the building form, to make the general effect of single map, for large commercial buildings and the production of bird's eye view of the plot is still lacking, but also the need for continuous learning and practice.
third, the program capacity:
program capability is a building architect must be an important ability. good plan directly with the application of the building, the economy, the three basic elements of beauty linked. over the past year, i participated in most of the company's project plan design, guihu garden, yiran habitat, bamboo yun court and other graphic design, i follow the design team leaders access to information, field trips, humbly ask, the successful completion of the established task. during this period, by the leadership of the trust, i also independently completed the garrison area hostel, a shuangpin villas and department stores, bamboo yun court 1,2 # floor flat elevation design. in the layout of the planar column network, i first arranged according to their own ideas about the structure of the column network, and then ask the structure of my colleagues to help check whether reasonable, invisible, i enhanced the concept of structure, enrich the expertise. in the process of independent design, i found a lot of shortcomings, especially the grasp of the program is still the lack of basic theoretical understanding, which are in the future work must be the first to strengthen.
工程监理自我评价 监理自我评价100字左右篇五
____工程,于20__年_月_日正式破土动工,在各参战单位的共同努力下,历经七个月多时间的艰苦奋战,最最终20__年_月_日完成了工程建设的各项目标。在施工监理过程中,我们严格遵循监理工作程序,努力控制好工程的质、进度和投资,及时组织协调施工中方方面面关系,督促施工单位搞好现场安全礼貌施工,确保了工程质量目标、进度目标和投资目标的实现。
一、质量控制
1、严把材料质量关
对于进场的材料,要求材质证明齐全,并经监理人员见证取样材料检验合格后方可投入使用。坚决杜绝不合格的材料进入现场。如:结构施工前,我们及时督促施工单位将钢筋、水泥、砂、石等材料送检,将钢筋焊接接头送检,并强调焊接等特殊工种人员持证上岗。对于施工单位未经监理见证取样的材料检验结果,我们宣布无效,要求重新取样送检;
2、自始至终强度质量意识,从严要求,不行的坚决整改。在主体工程开工后的一个月里,我们对施工单位进行了多次整顿。要求施工单位在浇捣砼前,拿出砼浇捣方案、组织措施、人员安排、施工现场总平面布置,并作好技术交底,保证一次浇捣砼材料到位90%。以免在浇捣过程中因发生材料无法及时供应而导致不能连续浇捣的现象。什么时候整改到位,什么时候方可浇捣第二次砼。施工单位经历了近一个星期的整顿,分别开了多次管理人员会和班组会,并加强了现场砼的搅拌强度。从而保证了工程的质量和进度;
在粉刷装修安装工程中,我们同样严格要求,各工序均以优良为标准来进行检查控制。不贴合设计及施工规范的,我们以监理通知和工程质量整改通知单等书面形式坚决要求施工单位按设计和规范要求进行了处理或返工,同时我们也及时鼓励与支持他们。随后,在与监理配合方面,施工单位也表现出了很高的进取性;在质量方面,也主动自我从严要求。
3、强调自检,同时坚持跟踪检查和抽检工作
每道工序我们均要求施工单位先做好“三自检”工作,然后报验,上道工序未经检验经过,施工单位不得进行下道工序施工。工程开工的初期,尽管施工单位照样报验,但问题成堆,甚至包括一些常识性的问题;有时,工序工作未完成就请监理验收,这显然表现他们省去了自检这一环节。对于这种情景,我们拒绝验收。
当然,我们等待报验也不忘跟踪检查。及时发现施工过程中存在的问题,及时为其指出,能够避免施工单位出现大面积的返工,加快工程进程。例如,在绑扎底板钢筋时,我们发现其撑铁太矮,有的甚至低5cm—6cm,为此,我们及时要求施工单位更换,并请他们尽快通知其加工厂,避免延续错误。在钢筋绑扎过程中,又经常发现施工单位将池壁转角加强筋遗漏,柱子加密箍筋范围扎错,都及时进行了纠正。抽检工作是我们控制工程质量的重要环节。说是抽检,其实,更多的分项工程或工序我们进行的是全面检查。关键点,我们更是进行了数次复核。例如,在砼浇捣时,我们随时抽查砂、石筛洗情景,砼的坍落度及配合比,以确保砼的质量。对钢筋绑扎、模板支设分项工程,我们一般均进行了全面的检查。梁柱拆模后,我们进行了再次复检,以防意外因素造成偏差,并发现一根柱子垂直度偏差3.5cm,及时作出了返工处理,避免了上部结构完工后造成的被动局面。
经过跟踪检查和抽检工作,我们及时发现了施工中存在的很多问题,并及时为施工单位出主意,想办法解决问题,以此还树立起了我们监理人员的威性,让施工单位感觉到我们不仅仅是在监督他们,更是在帮忙他们。
4、加强预控
加强预控,不仅仅能够减少施工过程出现的问题,避免不必要的返工,并且能够加快工程的进度。我们作为以往搞过很多水厂设计的监理人员,对类似建筑物、构筑物结构比较熟悉,所以,更容易做好房屋建筑监理的预控工作。我们主要从以下三个方面来着手:一是各分部分项工程开始前,再次进一步吃透图纸,发现出图纸会审时未发现的问题,避免施工中再发现而造成返工的现象;二是各工序、各分项工程开始前,提醒施工单位应注意的问题,应控制的关键是维点,以及容易出现的通病;三是要求施工单位各分项工程开始前,作好技术交底和工序交底。例如,结构施工阶段,做好施工缝的处理及施工缝留设的部位。对于跨度较大梁的施工,提醒施工单位注意起拱,并加强振捣和养护工作,要求该梁不得留施工缝。
二、进度控制
进度和工期也是我们控制的一个重要资料。在施工单位拿出总体进度计划后,我们要求施工要配有总体网络图,并按时拿出月计划、周计划。周计划在每周的例会上检查落实,月计划在审核施工单位每月进度款时落实。周计划、月计划未如期完成时,请施工单位先分析原因,然后拿出赶上滞后进度的措施。工程进行到必须的阶段时,要求施工单位清理工作量,倒排计划。监理人员也经常与施工单位负责人沟通,了解进度完成存在困难的原因,及时为施工单位出主意,想办法。如结构施工阶段,因钢管、模板用量较大,周转存在困难,我们及时施工单位领导反映,请他们给予支持,以确保工程的进度。
三、投资控制
在工程实施的过程中,监理部严格审查各承包单位报送的月进度款,严格按计量、按合同约定的付款方式支付。对于各方提出的设计变更,慎重对待,认真把关,有效地控制投资的增加。在工程决算的过程中,进取响应招标书,逐项审查,对承包单位决算中工程量的准确度和定额的套取及取费标准均进行了严格的把关。
四、协调工作
我们主要的协调工作在工程内部,主要是工程内部相关单位之间的协调。在工程的前期,主要是土建工作。后期,安装工作全面展开,施工队伍很多,相互间的协调工作也多了起来。一方面,我们强调各施工单位间要相互配合,互相沟通;另一方面,我们及时掌握各单位的进度安排,总体研究,统筹调整。
五、安全礼貌生产
自始至终我们均强调安全礼貌施工。诸如现场挂安全标识牌、标语;安全用电;进入现场要求戴安全帽,设置安全通道;特殊工种人员持证上岗,并严守操作规程;现场材料堆放有序,切实搞好现场安全礼貌施工。
六、重要工序及分项、分部工程质量认证情景
对本项目重要工序及分项、分部工程,从材料到结构实体都经过了有相应资质的检测、试验等单位,进行的检测和认证,具体情景如下:
1.地基与基础分部中有地基验槽记录、主体结构中的砼试块、砂浆试块强度统计评定,砼抗压强度检测报告共__份;
2.直接影响相关工程质量的原材料出厂合格证及进场检验报告__份;
3.满水试验报告,屋面灌水试验及见证检测报告_份;
4.隐蔽工程验收记录__份,预拌砼合格证_份;
5.分部工程质量验收记录_份、分项工程质量验收记录__份;
6.安装工程质量抽检情景;
7.分部工程质量验收记录_份、分项工程质量验收记录_份以上资料经验收全部合格。
七、监理抽检质量情景统计及数据资料汇总
1.工程材料抽检;
2.土建工程质量抽检情景;
3.检验批:__份、经验收全部合格;
4.安装工程质量抽检情景;
5.检验批:__份、经验收全部合格。
八、对工程竣工资料的审查意见
经对承包单位施工技术资料、质量保证资料、质量验评资料及竣工图的审查,我们认为各项资料基本齐全,真实、完整,贴合验收规范及验收标准的要求。
___工程建设工程监理工作中,本项目监理部全体人员能团结协作、纪律严明、勤奋工作,全面实现了监理合同目标以及廉正合同目标,并使常青花园供水转压站营业综合用房工程建设工程保质保量,在为业主提交了一份满意答卷的同时,也充分体现了我监理人员较高的技术素质和思想素质,工作成绩得到了业主的充分肯定,也为我监理公司赢得了声誉、树立了良好的企业形象。
工程监理自我评价 监理自我评价100字左右篇六
time flashed, such as the gap between the gap, 20xx is nearing completion, review their contact with the project supervision in the past year's work, under the leadership of the care and guidance, with the help and encouragement of colleagues, through their own unremitting efforts to master a certain amount of knowledge, but there are many deficiencies. report on the work of this year are summarized as follows:
first, the main work of the annual personal content
in this year's work, i participated in the supervision of dandong new district hospital project, during which i hold the work while studying the attitude of the work, summed up the work of each process and points to find do not understand problems, timely access to norms and to the leadership and colleagues advice, bit by bit accumulation of work experience.
the quality of work, according to supervision norms, engineering drawings and supervision rules strictly supervised. in the new district hospital project, most of the time i was at the site site, starting from the main project last year until now the external wall decoration and interior plastering. in the meantime found himself a lot of do not understand the place, through access to norms and other means to fill their vacancies in the area, the next encounter in a similar situation can be resolved independently. for the need to stand next to the station to do next to the station record, for the acceptance of hidden works in strict accordance with the norms of acceptance, if the acceptance is unqualified, is prohibited for the next process operations, such as october this year, b and e masonry projects exist structural column and the level of tie beam reinforcement and bar reinforcement quality defects, the supervision found that there are quality problems after several oral notice of its rectification, the construction unit is always dragging the ladder to muddle through, and i strictly abide by the norms and supervision rules for supervision work, its existence and refused to rectification problems issued a notice of supervision, and notify the construction unit project manager on the existence of some of the problems, and the construction unit of the masonry project submitted inspection materials strictly review, failure or not the place where the rectification will never sign. the entry of materials, equipment, and so the original certificate test report quality inspection documents to confirm and confirm the approach to the steel after the witness to follow the construction side of the quality inspection station and a series of tracking work. as a result of the construction site of some of the funds, leading to the progress of construction and construction plans for a more serious lag, du sum i have been in the middle of the coordination of construction units on schedule payment of funds, the construction unit reasonable arrangements for the process, that guarantee quality and duration. in this year's study and du total care, i strictly control the quality of the materials, inspection and approval, sub-project acceptance must be done personally check, conclusions and in-kind must be consistent. for the acceptance of the project has been plausible, the test is not in place, go through the motions and other situations, du total time to give guidance and help, i am more able to grasp the main points of the work.
second, the work experience and lack of experience
work experience and lack of supervision through this year's work, i feel as a supervisor only to do good behavior, strict self-discipline, into the team, respect for others, work seriously responsible for winning the respect of others. i met a lot of new things at the site. with du's careful guidance and help, i learned a lot of new theories and practical experiences, which not only enrich the knowledge i could not learn in the field of specialization and atlas, but also broaden my knowledge of the industry. this year i learned a lot of professional and technical knowledge and interpersonal skills to coordinate the work of the community to continue to work hard to learn, put their minds, from the beginning of social work to change the passive state to adapt to social initiative state, in order to relax the mood, full of energy to continue into the work of tension. in future work i will be more efforts to learn the knowledge and practice of the professional capacity, and constantly sum up the lessons, and strive to do better.
the professional quality of our supervisors is uneven and the level is far from meeting the market demand. most of the supervisors come from pure technology or construction enterprises. the knowledge structure is single, and the organization and coordination capacity is not enough. so i think i, as a young supervisor must pay attention to learning, to the site does not say outsiders, and can effectively solve the problems in the project for the construction unit advice and suggestions. elite backbone to keep making progress, play a leading role, the new young people to study hard, pay attention to practice, do a little bit, focus on the accumulation of experience, should catch up as soon as possible.
as the real estate industry is not a special boom, the supervision industry, the employment situation as if i have a higher demand, first, the business level should be high, single-minded on the project. the second is to improve relations and coordination. i think that supervision is a service behavior, through their own professional work by the construction unit recognition, to obtain compensation to the site, we must straighten out the position, not to experts, to the law enforcement of the tone, told the construction unit in accordance with the specification procedures and laws and regulations should be how to do, but to be good at explaining the situation, so that the construction unit to understand the benefits of doing so. on the construction unit and not to managers themselves, should be clearly identified problems, said clearly to strengthen inspection and acceptance. in the process of the new district hospital, i do have a lot of things can not be resolved, then i will let the construction side, the project director to coordinate, to avoid my own to try to be tough.
third, personal career development views and opinions on the company
personal career development planning: to engage in supervision work, know too much too little, can not be satisfied with the reality, so i still have to learn to do more next year, in accordance with the work needs to gradually in-depth study of the professional knowledge, work to comply with the companyof the management, enhance team awareness, further integration into our collective, and the use of spare time to learn more on the requirements of the standard to improve their business level. for myself, more for the company, i hope the company to organize some of our staff training, so that we can better do the job, so that we can do more for the company to do something, play a light and their own heat.
工程监理自我评价 监理自我评价100字左右篇七
一、一年来监理工作的基本情景:
(一)、一阶段:驻中铁__局监理工作情景
监理工作时间:20__年4月6日至20__年7月27日
监理工作范围:厦深线ⅲ标段dk125——dk131
主要监理设备情景:1、钻孔桩2、桥承台砼3、桥墩、台砼4、涵基础、身、盖板砼、沉降缝、防水层5、重点项目、部位现场旁站工作。
主要监理工作任务完成情景:
1、钻孔桩:71根。2、桥承台砼:21个。3、桥墩台砼:24个。4、涵洞:7座。涵洞防水层:20座。5、桥、涵工程检验批复核签字:687个。6、填写旁站监理记录:71份。7、填写监理日志:289份。
(二)、二阶段:驻中铁__局监理工作情景
监理工作时间:20__年7月28日至20__年12月20日监理工作范围:厦深线ⅲ标段dk110——dk112
主要监理设备情景:1、钻孔桩2、桥承台砼3、桥墩身砼4、箱型钢筋砼梁5、重点项目、部位现场旁站工作。
主要监理工作任务完成情景:
1、钻孔桩:151根。2、桥承台砼:38个。3、桥墩身砼:39个。4、箱型钢筋砼梁2孔。5、桥工程检验批复核签
字:1105个。6、填写旁站监理记录:153份。7、填写监理日志:434份。
二、监理工作的做法和体会
1、做法:(1)、重点控制:钻孔桩施工,有设计变更的,没有收到设计单位批准签字盖章的变更手续,专业监理工程师不能进行检孔验收。(2)、制作后成品钢筋达不到设计尺寸要求的,经验收不合格的,不能使用。(3)、构件钢筋的规格、数量、绑扎尺寸不贴合设计要求的,不予验收。(4)、桥承台施工:没有收到检测单位签字盖章合格的桩基检测结果通知单,专业监理工程师不能进行承台钢筋骨架、模板加固验收。(5)、要保证砼施工质量,必须控制各种材料设计规格、施工配合比、坍落度、砼的和易性。(6)、初张拉、终张拉后,对锚具、夹片进行全部检查,到达合格。(7)、孔道压浆后,对锚孔进行全部检查,到达全部合格。
2、体会:(1)、要保证施工质量,严抓施工过程管理。(2)、认真执行全过程旁站重点项目、部位,做到心中有数,并能保证施工质量及安全。(3)、要做合格的专业监理,就必须全面学习、掌握监理规范要求,严格执行监理规范。
三、对监理工作的提议和意见
1、现场监理组,应专设测量组。对设备的重点高程进
行复测。保证设备的几何尺寸要求。
四、监理工作需要加强的地方
1、承包单位的技术人员,技术资质不够,技术本事差,不能完成施工技术指导工作。个别特种作业操作人员没有合格资格证书,作业质量达不到技术标准要求。所以,监理部门对施工单位技术人员、特种作业人员的资质审核进行严格控制。
工程监理自我评价 监理自我评价100字左右篇八
20__年8月份,我监理部受公司委派至建业壹号城邦三期项目开展工程监理工作。一年多以来,我监理部严格遵守国家法律、法规和各项制度,爱岗敬业,坚持为业主服务的思想意识,对工作认真负责,严格按照设计要求和有关标准、规范进行监理,监理工作成果做到了让业主满意、让公司放心,圆满的完成了本项目本年度的监理任务。
一、在监工程概况
1、工程名称:三门峡建业﹒壹号城邦(三期)工程
2、工程类别:综合住宅
3、工程地址:三门峡市春秋路与建设西路交叉路口,春秋路以东,建设西路以北。
4、建设单位:建业住宅集团(三门峡)置业有限公司
5、设计单位:郑州大学综合设计研究院所
6、施工承包单位:中建七局第四建筑有限公司
二、监理工作情景
在本项目的监理工作中,我监理部工作人员能够严格遵守国家法律、法规和各项制度,爱岗敬业,对工作认真负责,诚实守信。坚持为业主服务的思想意识,对工作认真负责,严格按照设计图纸和相关专业技术标准、规范进行监理,围绕“三控制三管理一协调”的工作方针,在建设单位的领导、施工单位的配合以及我公司领导的长期关注下,将工程质量作为监理工作的重中之重,认真抓好安全生产和礼貌施工,做好工程施工过程中各方的协调工作,圆满完成了本项目本年度的监理工作任务,基本情景如下:
1、质量控制方面:工在进行质量控制的过程中,遵循坚持质量第一的原则。根据相关的国家及有关部门颁发的有关质量管理方面的法律、法规性文件,工程承包合同文件,施工规范,本工程有关的检验评定的标准和方法以及设计图纸,确定质量控制工作程序;采取事前、事中、事后控制相结合的质量控制方法,对投入的物质资源的质量控制、施工过程的质量控制和工程产品质量的控制,以工序质量控制为重点、以保证分项工程质量和单位工程质量,进而确保工程项目质量。
2、进度控制方面:由于影响工程进度的因素很多。所以,本工程项目的监理机构进度控制的重点是对本工程的进度进行检查、评估和对局部具备施工条件的项目施工进度进行监督,消除承包商自身管理水平的影响。在消除承包单位自身管理水平的影响时主要采用技术措施和合同措施,经过及时处理工程所遇到的技术问题尽可能地为施工单位创造条件;经过监理指令督促施工单位增加资源的投入,改善施工工艺,加快施工进度。
3、造价控制方面:严格审查施工单位申报的工程量并配合我公司造价及跟踪审计人员对现场的工程量进行确认,同时严格控制工程建设过程中的各种签证,对于施工单位不合理的签证要求一律不予办理。自工程开工以来,不良签证为零,对工程造价的控制基本得到建设单位的认可。
4、安全管理方面:“安全第一,预防为主”,安全生产、礼貌施工是施工过程中的一件大事。督促承包商对施工人员进行安全教育和安全技术交底。严格审查施工组织设计中的安全技术措施或者专项施工方案是贴合工程建设强制性标准。监督施工单位按经审查的安全技术措施和专项施工方案组织施工。在实施监理的过程中,发现存在安全事故隐患的,要求施工单位整改;情景严重的,要求施工单位暂时停止施工,并及时报告建设单位。每周组织的检查现场的安全礼貌施工,发现问题和隐患,督促施工单位限时整改。
5、合同管理方面:监理机构进场后由公司专业合同管理人员对本工程相关合同向项目监理人员进行了交底,总监理工程师组织监理人员认真熟悉了本工程相关合同,对合同进行了分析,充分理解监理部在项目管理工作中的职责、权利和义务,明确监理工程师与业主的分工与协作关系,以顺利地开展监理工作。分包单位进场施工前,严格审查了分包单位资质和人员资格,使合格的分包商业进场施工,确保工程的质量和合同的履行。在施工中公正地按合同条款开展监理工作,督促施工单位按照进行进度计划组织施工,确保项目工期,监理工程师根据合同条款审批进度款,防止超付。代表建设单位严格按照合同条款实施监理,监督施工单位按合同约定事项进行施工。
6、信息管理方面:在管理过程中,规定了信息管理流程,制定了各种管理制度,采取了经济措施、合同措施,促使承建单位及时地提交有关资料。并运用计算机等手段对各类信息进行管理,为工程的质量、进度、投资情景的评估和决策供给了可靠的依据。
7、本工程监理工作的实施,得到了市质监站、业主单位的大力支持。市质监站有关人员经常巡视施工现场,对一些重点部位和关键工序提出了质量控制的进取提议和要求,对保证工程质量起了重要作用。在此特向以上各单位表示衷心感激!
以上是对我项目本年度监理工作的总结,我项目部相信,在公司领导一如既往的关心和建设单位的支持以及施工单位的配合下,我项目监理部全体人员必须不负众望,定能顺利完成本项目的监理任务,保证让公司放心,让业主满意。
工程监理自我评价 监理自我评价100字左右篇九
在过去的一年多时间里,我在xx项目一组团担任土建监理工程师职务,该项目涉及到土建、电气设备、园林工艺、市政管网等多种专业,是比较大的综合性项目,作为土建监理工程师的我,感到任重而道远,特别是高层建筑施工,工程量大而且施工难度和质量要求都比较高,针对该特点,在项目监理部总监及总代的带领下,制定了具有针对性的、切实可行的监理方案。从基础到主体,每道施工工序严格按照监理规范、图纸设计和国家现行施工质量验收规范实施监理工作,以抓好对建筑材料的质量控制和对施工工艺的质量控制为重点工作,确保建筑物结构安全,对工程所需的原材料审查其材料质保单、复检报告、见证取样、送检,审查其试验结果,确保原材料质量。在高层主体施工中严格检查钢筋的绑扎质量和钢筋的保护层厚度以及砼的浇筑振捣,对各施工过程中的巡视、检查所发现的问题及时采用口头形式或书面形式通知施工单位项目部,做到发现问题及时向总监汇报,并督促施工单位落实整改及进行再次的复核检查,并要求监理人员做好关键部位的旁站监理,尽自己最大的努力做好监理控制质量的事前与事中控制,尽职尽职的做好我应该做的工作,坚持了严格按图、按规范、合同实施监理,确保各分项、分部工程的合格验收。
在1-5#楼及37#楼主体结构施工现场的监理工作中,我深感自己对主体结构工程的不足之处,对此我查阅了大量的技术规范和施工验收规范,通过自身的学习和实践掌握了与主体结构相关的技术和经验,从主体结构的模板搭设到钢筋安装和砼浇筑,严格检查每道工序施工质量,钢管构件、钢筋型号、钢筋锚固、搭接长度,钢筋原材及半成混凝土等进场后,均认真审核相关资料是否齐全,核对质保资料与材料批号是否一致,同时对有关材料进行见证取样送检,全部符合设计及规范要求。特别是钢筋及混凝土的质量,要求施工方按规范要求进行了见证取样、送检,保证了主体结构的工程质量。
根据工程特点及影响工程质量的关键部位,审核承包人提交的施工组织设计,并针对其不足之处提出改进意见,核查进厂材料的原始凭证、检测报告等质量证明文件。并做好事前控制,确保工程质量及安全事故不发生或少发生。例如:冬季施工,气温较低,砼浇灌、砌体砌筑、墙壁抹灰等都不易保证质量,因此要求施工单位提供冬季施工方案,提前预防,避免冻害发生。
对重要工程部位及易出现质量问题的分部工程制定质量预检措施,例如:土建工程混凝土浇筑工程施工中,梁板、柱是工程的重点部位,涉及到模板、钢筋绑扎、砼浇灌等多道工序,一旦疏忽就可能造成工程质量事故,一旦出现质量问题后果严重,因此在该部位施工中,加强监控,采取旁站监理措施,严格监理各部位的施工,并对影响施工质量的因素事前提出,要求施工单位编制预防措施及施工方案,从而保证了梁板、柱的施工质量。
为加强事中控制,在监理xx公司施工队的施工过程中,发现该队伍使用的商混存在质量问题,使其局部楼板存在开裂现象,虽然承包商有实验室的质检报告,但本着为业主负责的态度,及时对该批混凝土采取平行检验手段进行抽检,确信其各项强度指标满足设计要求后方允许施工单位使用。该队伍在砌体砌筑、墙壁抹灰施工中也存在质量问题,为保证施工质量,本人及时下发监理通知并要求施工单位对质量有缺陷的部位做修补处理,并达到设计、规范要求的质量标准。
在监理工作中,要求施工单位在施工过程中,按照设计内容、设计要求、施工验收规范,按质、按量施工,确保了施工质量、无安全隐患。在各工序施工中,要求施工单位严格执行国家和地方有关施工质量报验制度,对施工单位交验的有关施工质量报表和隐蔽资料及时检查签认,根据设计文件及承包合同中有关工程量计算的规定,对承包单位申报的已完工程的工程量进行审核、签认并做好记录。
监理记录是工程监理不可缺少的环节,本人有完整而充分的监理日记,旁站记录及安全监理日记,详细的记录了每天施工现场的有关情况,为公平的解决业主与承包商的争端提供可靠依据。本人在一组团工地的监理过程中,积极协调各单位间的关系,使它们相互配合,相互支持,搞好衔接,保证了施工质量和进度的按期完成。通过上述工作,本人完成了一组团1#楼、2#楼1、2单元、3#楼1、2单元主体结构的土木建筑工程的监理情况,一年多的监理工作收获很大,但也有不足,例如:本人是建筑工程管理专业的,对水电专业知识了解不多,有些工艺要求不十分熟悉,而监理行业要求监理工程师应具备多学科、多行业丰富的知识,因此本人在各学科专业知识方面,还需继续努力学习,不断提高自己的业务能力和专业水平。
总之,一年多的工作给我的体会是作为一名监理工程师不仅要具备丰富的专业知识,而且还要有较强的沟通协调能力,只有不断提高自己的专业技术水平和业务能力、提高自己的沟通能力和环境的适应能力,才能更好的服务于工程的建设,才能使自己得以更好的发展。在工作中各种不同的压力对我来说也是一种难得的挑战和考验,尽管一年来的工作中有很多的困难和曲折,但回首过去,也使我懂得了很多、认识了很多,同时也总结了不少的经验和教训,为以后更好的工作奠定了坚实的基础。
x年已经到来,在这新的一年里我将不断地完善自身的不足,总结经验和教训,不断加强自身专业技术水平和业务素质的提高,不断的充实自己。我坚信在公司领导和各位同事的大力帮助下一定能更好完成我的各项工作任务,为公司做出自己应有的贡献。
工程监理自我评价 监理自我评价100字左右篇十
20__年,是我在__工程监理公司担任项目总监的第一年。一年来,在公司的正确领导下,在建设单位的大力支持下,本人深入学习贯彻、落实了公司20__年有关精神。以科学、公正、守法、诚信为准则,以监理服务质量为保证,以提高公司效益为目标,不断加强和建设单位的相处关系,不断优化内部管理和运作模式,监理部方方面面的工作都有了新的进展。
“勤奋工作,严谨科学,一丝不苟,公平公正”是本人自我要求。严格遵守公司的各项规章制度,能够按时出勤,遵纪守法,注重团结。在工作上,虚心向领导和其他同志请教,使自我受益良多。理解每项监理任务后,认真审阅图纸和设计文件,对图纸和设计文件中存在的问题或不明之处及时记录整理并经过建设单位同设计人员沟通以利于进行图纸会审和交底;全年监理了建安(杭州)科技有限公司新建厂工程本工程建筑总面积为19392.1平方米,由三栋六层厂房和一栋三层办公楼组成,均为框架结构。其中已经顺利经过主体验收。
一、在质量控制方面
1、对施工质量的过程控制是:督促承包单位的质量管理和质量保证体系的落实;
2、根据工程的规模、特点及时编制监理规划和监理细则,抓住对安全及使用功能的实施;
3、检查督促承包单位完善管理,保证质量保体系的正常运行,扭转监理人员较少而不能对整个工程全过程进行监督的被动局面。
4、工程中使用的原材料要求承包单位按见证取样,要求加强材料的进厂验收;
5、按照新版施工质量验收规范,加强对结构安全和使用功能的检测控制。
二、在进度控制方面
__(__)科技有限公司新建厂工程工期要求十分紧。自我严格按照施工合同工期催促施工单位进行施工,基本保证了各项工程的按期完成。
三、投资控制方面
一年中,自我深入工地,对土方量、垃圾量和各项施工工作量进行丈量核对,对入场的各种材料进行鉴别验收,保证了资金的合理使用。
四、协调管理方面
由于前期工作中,承包单位项目部管理体系不健全,项目管理班子不能到位,给监理工作带来了较大的难度,监理部除经常向建设单位通报情景争取支持帮忙外,尽可能处理好各施工队之间和外部环境的关系,协助承包单位抓好安全生产和礼貌施工工作。
五、监理资料的收集、整理方面
在监理工作中,我重视监理资料的收集、整理、归档的管理,随着工程的进度及时做好技术和质保资料的签认、收集工作,不推不拖,为资料的整理归档工作打下了良好基础。为了确保工程资料齐全完整、贴合要求,监理部的人员都对现场的资料人员进行过交底。项目监理部对下发的文字性文件,要求用词严谨准确,分寸掌握适度,语言流畅,资料详实,要反复推敲,避免出现错字、错词,因为监理文件体现着公司形象和监理人员的水平。
六、关于如何加强监理项目部质量保证体系的提议
监理公司的服务质量是经过总监理工程师为核心的监理工作质量保证体系的正常运行来实现。经过几年的实践,我觉得加强项目监理工作的质量保证体系是十分迫切的,我在工作和实践中,总结应用了“一个核心”、“三项措施”,取得较好的成效,提议公司加以推广。
1、“一个核心”就是落实总监职责制
⑴预控管理;⑵程序管理;⑶文件签署;⑷检查考核。
2、贯彻三项措施
⑴技术交底先行;⑵严格首件监理工作验收;⑵定期开展学习交流。
在监理实践中,认为经过“一个核心、三项措施”,努力构建项目监理机构的质量保证体系,不但抓住了重点、提高了监理工作效率,并且有助于经过健全体系规范监理工作的行为,为创立“专业化、规范化”监理工作的目标打下良好的基础。
最终感激公司领导和各个职能部门一向以来对我项目监理部监理工作的大力支持和指导。新的一年里,我决心继续发扬延安艰苦奋斗精神,团结教育从业人员努力学习,克服各种困难,适应各种环境,一如既往的开展监理工作,合理调配监理人员,更好的监理工程,为监理公司赢得效益和荣誉。
工程监理自我评价 监理自我评价100字左右篇十一
回首过去,展望未来,有对本年度收获的喜悦,也有对未来急切的期望,喜悦的是我在领导和同事们的关怀帮忙下,认真学习领会公司企业文化精神,以公司服务理念为指导,经过自身的不懈努力,较好的完成了本职工作和领导安排的任务;期望的是我深深明白在从事监理工作当中仍有较多的不足需要学习和改善,我将总结经验,反省自身不足,提高自我的监理业务水平,成为公司更好更快发展过程中的一员,现就本年度监理工作情景总结如下:
一、个人年度主要工作资料及岗位职责履行情景
20__年上半年,我主要参与了潍坊滨海开发区中央商务区软基处理工程现场监理工作,下半年,主要参与了潍坊滨海旅游度假区人工沙滩工程现场监理工作。
在这一年的工作中,服从领导安排,认真履行岗位职责,工作期间,我从不放松加强理论和实践的研习,严格要求自我,认真为建设单位热情服务,遵照监理合同要求,严格按照监理规范及监理工作程序,履行监理职责。
在施工过程中,采用旁站、巡视、平行检验方式进行每道工序的过程控制。对现场存在的质量安全问题,调查研究找出问题的根源,要求施工方采取有效解决办法将其解决,全程跟踪监督施工方落实整改,杜绝类似问题再次发生。
针对进场材料(高强土工格栅、土工布、栅栏板、压脚块、踏步料石等),按照标准和设计要求对施工方提交的相关报验资料进行核查,对材料进场时进行外观质量检查,对外观质量上不贴合要求的禁止用入工程中。
针对工程关键部位施工时,提前到达旁站位置,检查施工准备工作,并旁站施工全过程,及时、完全真实地作好书面的旁站记录。
对要验收的隐蔽工程严格按照验收规范进行验收,如果验收不合格,令其整改直至合格,才能进行下道工序施工。
对各施工过程中检查所发现的问题,及时采用口头形式或书面形式通知施工单位工程项目管理部,发现问题及时向总监汇报,并督促施工单位落实整改及进行再次的复核检查。尽自我最大努力做好工程建设施工阶段的监理工作。
二、工作中的体会和感受
在监理工作过程中,我经过对监理理论的学习以及现阶段监理行业的发展状态的认知,深刻体会感受到作为监理人员,进取主动为建设单位的利益着想,为工程质量负责,为施工人员的安全负责,才是监理工作的信念和无穷力量。仅有具备较高专业技能和综合素质及良好的职业道德,才能真正做好监理的本职工作,才能够体现守法、诚信、公正、公平的执业准则20__年监理工作总结范文5篇20__年监理工作总结范文5篇。明白监理工作的重要性,树立正确的监理工作态度,用实事求是的工作态度去处理施工中出现的各种问题,才能有效地开展工作,进取主动的运用自我专业技术及聪明才智,科学公正的行使监理权利和义务,与施工单位搞好工作配合,满足建设单位的要求,为业主供给优质高效的服务。
三、今后的工作打算及个人职业发展意见
作为一名年轻的监理工作者,热爱自我的本职工作,有良好的工作作风和吃苦耐劳精神,工作态度严禁,喜欢钻研工程监理中出现问题产生的原因及处理方法,热衷于对工程问题处理方案的积累。
在今后的工作中认真履行自我的岗位职责,要严格按国家规范、以设计图纸为依据实施监理工作。在工作中不断反省自身不足,加强监理业务学习,不断提高自身素质,努力做好监理工作,加强对管理理论知识的学习,灵活多变的处理实际问题,认真完成领导交给的各项工作,努力将自我的专业技术水平提高到一个新的台阶,真正成为一个合格的监理人员。
四、对部门公司的意见和提议
1、提议公司要对不一样的员工进行有针对性的专业培训,多招聘一些有职业资格证书又能独当一面的人才开展工作。
2、提议公司组织具有良好公关本事的人才,并组建成相关部门,应对监理行业的社会化、监理招投标的公开化、复合化20__年监理工作总结范文5篇工作总结。
五、结束语
公司领导的关心支持及工作条件的舒适给了我努力工作的动力,同事间的热情关怀及协作互助给了我工作的舒畅感和踏实感,公司特有的企业文化氛围给了我工作的信心。我坚信自我能够在今后的工作中做的更好,为公司的发展贡献自我的一份力量。祝公司全体人员工作顺利、生活幸福。
工程监理自我评价 监理自我评价100字左右篇十二
应对即将成为过去的20__年,回首过去,展望未来,我带着收获的喜悦,同时也带着急切期望的心境,欣喜的是我完成了本年度公司交给我的监理工作任务,急切期望的是我深深明白在从事监理工作当中仍有较多的不足需要学习和改善。为评价经验,反省自身不足,提高自我的监理业务水平,成为公司更好更快发展过程中的一员,现就本年度监理工作情景评价如下:
一、服从领导安排,认真履行本职工作
作为一个年轻人,首先我必须摆正自我的位置,清楚自我的优点和不足。经过一年的监理业务理论和实践的感知,20__年能够说是我学以致用,增强实践的一年。20__年5月9日之前,我被安排在陕教院项目监理部和西岳新家园项目监理部。陕教院项目监理部工作期间,在总监代表的指导和帮忙下,我主要负责各施工单位竣工资料及监理部资料的收集整理工作,和叶田仁同志负责该项目的室外总体及各单体楼后期收尾未完成的施工部位实施监理工作,并对现场构成的签证及时进行工程量的确认。
在西岳新家园项目,因属还未正式开工项目,在总监代表的指导和协助下,由我和王尚龙同志负责处理施工前期监理工作,主要对业主需完善的“三通一平”进行督促及工程前期施工手续办理提出合理提议,并对各施工单位基础开挖标高及各楼号定位放线进行复核。工作期间,本着认真为建设单位热情服务,遵照监理合同要求,严格按照监理规范及监理工作程序,履行监理职责。工作中,我以老前辈严谨负责的工作作风为标准,工作岗位上,我从不放松加强理论和实践的研习,严格要求自我,认真熟悉监理规范及监理职责,对“三控、三管、一协调”具体在现场如何落实监理程序,根据工程实施不一样情景,进取主动为建设单位提出合理提议,让建设单位认可监理部的工作成果,使工程处于受控状态。
20__年5月10日,因工作需要,我被派往阳光城卡地亚项目监理部担任土建监理工作。刚来工地,工作条件较差,吃住问题没有解决,天气炎热,回西安路程又很远,可是,困难面前,我没有埋怨,没有退缩,因为我身负重任。阳光城卡迪亚项目一批次a、b标段处刚开工阶段,销售示范区4栋楼正处主体施工阶段,在总监代表的指导和帮忙下,安排我负责a标段的现场监理工作,我也明白没有压力就没有动力,没有动力就没有提高,年轻人仅有提高才能更好的胜任工作,才能将工作干好。作为年轻人,我没有过高的经验技术,也没有历经多年老前辈处理问题的游刃有余,我仅有相信自我能够把公司交给我的工作干好。
刚开始,我主要对现场实际情景及时了解,及时熟悉施工图纸和监理合同资料,掌握监理规划和监理细则。本工程为欧式别墅,业主对监理部工作要求高。我进取思考本工程监理工作的重点和难点,应对重点,我和项目部同事齐心协力,认真审阅施工方案,每道工序施工前督促施工方做好施工技术交底,强化隐蔽工程质量控制力度,严防产生质量隐患。应对难点,除了及时查阅相关资料,并及时请教资深的专业技术人员,寻找解决问题的好办法。在施工过程中,严格按照监理规范,监理合同资料,按照公司编制的质量控制办法,采用旁站、巡视、平行检验方式进行每道工序的过程控制。
重点对施工方项目管理人员的质量和安全意识进行调查,加强监督施工单位的三检制度落实,对质量和安全意识不到位的施工管理人员加强说服,强化完善施工单位的质量管理体系。对现场存在的质量安全问题,调查研究施工方内部管理情景,找出问题的根源,并要求施工方进取主动采取有效解决办法,职责具体落实到每个人,并对出现的较大问题,全程跟踪监督施工方落实整改,达标后才算完毕,杜绝类似问题再次发生。经过将近两个多月坚持质量和安全不松懈的监督控制,我发现随着施工作业面的增加,进度的加快,监理工作量增加的同时,但现场实际控制效果仍有疏漏处。如混凝土表观质量达不到施工合同约定的中级抹灰的效果,模板安装局部尺寸偏差较大,安全上临边洞口防护不及时等现象。
我作为a标段主要职责人员,我想我不能不重视这些质量安全问题,作为监理人员,这是我必须要控制的范围,经过冷静思考,应对现场实际情景,我当天夜里编写了关于落实施工方质量三检制度及监理报验程序的文件,经过总监代表的修改和认可,第二天对施工方召开质量安全专题会议,就文件资料对施工方进行交底,再一次明确质量控制和安全控制的工作程序,严格按程序办事,职责落实到人,进一步加强了施工方的质量和安全管理力度。现a标段在建的8栋单体楼年前主体即将封顶,在施工期间,质量和安全都处有效控制状态。
二、监理工作范围广,控制重点是关键
在阳光城项目部,业主重点要求监理人员对工程质量、安全和进度实施监控,a标段各单体楼屋面为45°斜屋面,施工中存在较大安全隐患,同时屋面混凝土板厚控制很难掌握,在要求施工方提前上报的斜屋面专项施工方案中,经审阅,发现有些安全质量技术措施不具备可操作行,提议施工方另选其它方便可行方案,我及时将该问题反映给总监,总监提出了较好的施工提议,施工方采取了该提议,不仅仅缩短了斜屋面施工时间,还保证了屋面板板厚和混凝土浇筑质量,施工过程中未出现任何安全事故。
在进度控制方面,我认真学习了公司编制的进度控制办法,并根据本工程实际情景制定了具体进度控制实施办法,以建设单位要求的施工进度节点为依据,对施工方编制的总进度计划经总监审核经过后,我认真核对施工方编制的月进度计划及周进度计划,每周五中午对现场实际完成情景与周进度计划相比较,找出偏差原因,并及时与施工方生产经理沟通,要求及时采取有效措施,把进度抢回来。
三、监理工作是行为成果,进取主动控制是监理人的执业灵魂
在监理工作过程中,我经过对监理理论的学习以及现阶段监理行业的发展状态的认知,应对激烈竞争的监理市场,作为监理人员,进取主动为建设单位的利益着想,为工程质量负责,为施工人员的安全负责,才是监理工作的信念和无穷力量。仅有具备较高专业技能和综合素质及良好的职业道德,才能真正做好监理的本职工作,才能够体现守法、诚信、公正、公平的执业准则。而在目前,有的监理人员觉得当监理对年青人来说是在浪费时间,对年长的是在混日子,这种不明白监理工作的重要性,没有职责感和使命感,不尊重自我工作的监理人员应当好好反省自我,树立正确的监理工作态度,进取主动的运用自我专业技术及聪明才智,热情服务业主,科学公正的行使监理权利和义务,从自身做起,从每个项目监理部做起,为公司发展壮大奠定坚实的基础。
四、反省自身不足,加强监理业务学习,不断提高自身素质,努力做好监理工作
在阳光城项目监理部工作期间,设计图纸中出现很多错漏碰缺的地方,再加之设计变更频繁出现,我深刻意识到对图纸的掌握必须到位。另外,安装图纸及安装施工技术我还没有全面掌握,为更好的以设计图纸为依据实施监理,我必须在后期工作当中,认真对设计图纸的全面掌握再下真功夫。
在实施现场监理过程中,我发现自我对管理理论知识的掌握不够,最有效的管理是对人的管理,如何让工程处于受控状态,就是必须让具体实施施工管理的专业人员处于监管状态。那种任由施工单位自由式发挥的施工管理,监理人员形同虚设,到最终只能说明监理人员无能,最终造成建设单位不必要的损失。甚至出现难以预料的质量安全事故,所以,在今后的工作中,我必须掌握必须的管理理论知识,灵活多变的处理实际问题,真正成为一个合格的监理人员。
工程监理自我评价 监理自我评价100字左右篇十三
本人___,26岁,建筑工程管理专业,助理工程师职称,二级建造师职执业资格。自__年5月20日进入本公司,受公司委派北京经济技术开发区南部新区_17r1地块住宅项目9号楼等7项工程土建监理工程师。北京经济技术开发区南部新区_17r19#楼等7项工程由由3栋24层和3栋27层的高层住宅环绕一座大型地下车库组成的建筑群体组成,总建筑面积122240㎡,工程已进入竣工验收阶段。回顾这一年来的工作,展望我们监理部明年面临新的任务与挑战,感触颇多。回首过去,首先要感激的是公司领导的关心和信任,还有各位同事们的大力帮忙和支持。
进入工地以来,我始终坚持以一个高素质管理人才的标准规定自我,爱岗敬业,尽职尽责,认真完成公司领导和甲方交付的各项工作。日常工作中能高标准严格规定自我,在法规和协议授权的范围内,身正形严,严格履行自我的岗位职责,既不和施工单位打成一片,也和代建单位坚持必须距离。站在公正的立场上,独立地解决工地发生的一些问题。
在监理过程中,我抓住“质量、进度、投资”和安全方面来控制,主要强调事前控制,预防为主,防患于未然。结合事中控制的巡视和旁站、事后控制的检查和验收。
质量控制:开工前审查施工单位的质量保证体系及安全技术措施,对不贴合工程情景的及时要求施工单位整改,并监督检查施工单位的落实情景,督促施工企业完善质量、安全管理程序和管理制度并监督其有效实施20__年监理工作评价范文5篇20__年监理工作评价范文5篇。规定各级施工人员持证上岗;检查施工企业所使用图纸、图集、规范、标准的有效性,检查所使用计量器具和测量器具的准确性(是否在鉴定周期内);对进场材料、设备、构配件进行审查。目前工程已进入到竣工验收阶段,我制定了每周项目部组织施工单位对现场进行质量、安全综合检查制度,检查主要包括以下问题:上次检查的结果,整改了什么问题还有什么问题未整改到位本次检查新发现了什么问题并体此刻监理周、月报和周检、月检记录里。日常的巡视中,我发现质量、安全隐患及时口头通知或下发监理工程师通知单令施工单位及时整改。每一天对已验收经过的分项、分部工程予以签认,对施工单位上报资料及时汇总归档,为顺利验收做准备。
工期控制:严格监督施工企业按照已批准的进度计划规定的工期组织施工,督促施工单位项目部按年、月、周等时间段编制进度计划并对其提交进度计划实施的保证措施予以审查。及时核对工程形象进度,向建设单位汇报工程进展情景并分析偏差缘故!。
投资控制:认真审核本专业月、季、年度工程量报表,做到不超验,不漏验,保证工程量签证的各项工程数量准确。未经验收或经验收不贴合规定的不予签认。
在工作中,我珍惜自我的名声,坚持廉洁自律,恪尽职守,拒收受不正当利益,摆正自我的位置,工作中不要认老乡,称兄道弟。公正及时解决工作中的问题,平时不计时间和报酬,休息日、节假日坚持坚守岗位。
__年即将过去,回顾这一年来的监理工作,体会最深的是做好监理工作,就必须严格认真,有较强的职责心,不管多么复杂的工程只要监理人员能够一丝不苟地按照施工规范、规程履行职责,就能全面的掌握整个工程动态,控制整个工程质量,同时监理人员具备了较高的业务素质,就能对每一工序,每一环节,做到事前提示,将可能出现的质量问题消灭在萌芽状态,并对可能造成质量隐患的环节事先防范。总之,一年工作给我的体会是作为一名监理人员仅有做到品行端正,业务精练,能够很好运用自我的经验和职权检查工作,目的明确、作风严谨、尊重他人,仅有这样才会被别人尊重和社会认可。作为工程技术人员,仅有不断提高自我的专业技术水平和业务本事、提高自我的沟通本事和环境的适应本事,才能更好的服务于工程的建设,促进工程质量的优良,才能使自我得以更好的发展。在负责的工作当中,各种不一样的压力对我来说也是一种难得的挑战和考验,尽管一年来的工作中有很多的困难和曲折,但回首过去,也使我懂得了很多、认识了很多、也学到了很多,同时也评价了不少的经验和教训,为以后更好的工作奠定了坚实的基础。
过去的都已经过去,成绩的取得和失败的教训也只能代表过去的一种经历。未来的发展还要靠以后不断的努力与创造。
对于本人来讲,在以后的工作和生活当中我将不断地完善自身的不足,评价经验和教训,不断加强自身专业技术水平和业务素质的提高,不断的充实自我,争取为明年的工作计划做出更大的努力。同时我在平时注意给自我充电,及时到市人事考试网上搜索考试信息,争取给自我赢得更多的的职业资格,争取早日考研让自我本事更上一层楼;从各方面努力提高自我的综合素质,向综合管理人才的目标前进,为公司也是为自我做更大的贡献。
__年即将到来,新的一年任重而道远,我要以新的工作姿态迎接挑战,以崭新工作面貌进入新的一年。我坚信在公司领导的引导下和各位同事的大力帮忙下必须能更好完成上级交给我的各项工作任务,为企业发展和腾飞做出自我应有的贡献。
工程监理自我评价 监理自我评价100字左右篇十四
时间过的很快,一转眼20__年又要过去了,在这年终岁末之际,回顾自我一年来的监理工作生活,有苦过,有累过……
在过去的一年里,在分公司与项目部领导的指导与带领下,我认真坚持正确的工作指导思想,树立“让业主满意”的的服务宗旨,尽心尽职,兢兢业业,努力完成工作,公司监理的年终工作总结。
1月份至8月份末,在连云港项目部王总的带领下,为连云港东海电信业主做出了优质的服务,在监理工作中,严格要求自我,树立自身强烈的职业职责心,对待工作不马虎,不偷懒,尽自我最大的努力把监理工作做好,遇到不懂或者自我不确定的事情,及时向公司中的经验丰富的老前辈请教,及时正确的处理好每一件事情。
1月份至5月份,连云港东海电信分公司的工程项目为ftth为主,为了配合业主参与“光网江苏”的竞赛计划,为了更好的为业主服务,在公司领导的安排下,顺利的拿到ftth工程项目上岗证。在ftth的工程建设项目的工作中,严格把握质量关口,定时定量的对已经完成改造的小区进行巡检,巡检过程中发现的施工工艺的问题,及时通知施工单位的相关负责人进行限时整改,同时以书面报告的形式上报业主。
巡检工作的主要资料为:布放主干光缆的布放路由是否与设计相符、新设ftth专用光交的安装质量、光交内光缆的熔接以、光分路器箱内皮线光缆的施工工艺及标志牌的粘贴。并定时的将ftth工作以周报的形式上报项目部,同时将ftth的工程进度与ftth完成的装机量以日报的形式上报业主。
随后下半年又开展宽带提速的计划,在宽带提速的计划里,其中有40个综合点,260个纯宽带点,并每月上报业主宽带提速的月份工作总价及下月的工作开展计划安排。对于有电缆拆旧的割接点,严格把握电缆拆旧部分,在施工前,要求施工单位对施工组织方案进行检查,对于施工单位提出存在材料使用变更的割接点,严格的根据施工现场进行查看。在电缆拆旧的工程中,以旁站的监理方式监理电缆拆旧过程,并记录电缆拆旧的电缆断长,在电缆入库时进行核实。
每一项工程开工前,对工程主要计划的工程项目包括工程所用的材料以及施工顺序做一些详细的了解,对现场施工的材料做明确的检验,根据建设单位交出的工程设计文本,与当日现场施工的情景做一个比较,最终向业主汇报当日的施工现场情景,让业主能够在第一时间了解工程的施工现场情景及施工进度20__年监理工作总结范文5篇工作总结。在监理过程中,我主要抓住质量、进度、安全方面的控制,主要强调事前控制,预防为主,结合施工过程的旁站,若发现质量及安全隐患,及时以口头通知形式令施工单位进行整改。
工程监理自我评价 监理自我评价100字左右篇十五
回首过去,展望未来,有对本年度收获的喜悦,也有对未来急切的期望,喜悦的是我在领导和同事们的关怀帮忙下,认真学习领会公司企业文化精神,以公司服务理念为指导,经过自身的不懈努力,较好的完成了本职工作和领导安排的任务;期望的是我深深明白在从事监理工作当中仍有较多的不足需要学习和改善,我将评价经验,反省自身不足,提高自我的监理业务水平,成为公司更好更快发展过程中的一员,现就本年度监理工作情景评价如下:
一、个人年度主要工作资料及岗位职责履行情景
20__年上半年,我主要参与了潍坊滨海开发区中央商务区软基处理工程现场监理工作,下半年,主要参与了潍坊滨海旅游度假区人工沙滩工程现场监理工作。
在这一年的工作中,服从领导安排,认真履行岗位职责,工作期间,我从不放松加强理论和实践的研习,严格要求自我,认真为建设单位热情服务,遵照监理合同要求,严格按照监理规范及监理工作程序,履行监理职责。
在施工过程中,采用旁站、巡视、平行检验方式进行每道工序的过程控制。对现场存在的质量安全问题,调查研究找出问题的根源,要求施工方采取有效解决办法将其解决,全程跟踪监督施工方落实整改,杜绝类似问题再次发生。
针对进场材料(高强土工格栅、土工布、栅栏板、压脚块、踏步料石等),按照标准和设计要求对施工方提交的相关报验资料进行核查,对材料进场时进行外观质量检查,对外观质量上不贴合要求的禁止用入工程中。
针对工程关键部位施工时,提前到达旁站位置,检查施工准备工作,并旁站施工全过程,及时、完全真实地作好书面的旁站记录。
对要验收的隐蔽工程严格按照验收规范进行验收,如果验收不合格,令其整改直至合格,才能进行下道工序施工。对各施工过程中检查所发现的问题,及时采用口头形式或书面形式通知施工单位工程项目管理部,发现问题及时向总监汇报,并督促施工单位落实整改及进行再次的复核检查。尽自我最大努力做好工程建设施工阶段的监理工作。
二、工作中的体会和感受
在监理工作过程中,我经过对监理理论的学习以及现阶段监理行业的发展状态的认知,深刻体会感受到作为监理人员,进取主动为建设单位的利益着想,为工程质量负责,为施工人员的安全负责,才是监理工作的信念和无穷力量。仅有具备较高专业技能和综合素质及良好的职业道德,才能真正做好监理的本职工作,才能够体现守法、诚信、公正、公平的执业准则。明白监理工作的重要性,树立正确的监理工作态度,用实事求是的工作态度去处理施工中出现的各种问题,才能有效地开展工作,进取主动的运用自我专业技术及聪明才智,科学公正的行使监理权利和义务,与施工单位搞好工作配合,满足建设单位的要求,为业主供给优质高效的服务。
三、今后的工作打算及个人职业发展意见
作为一名年轻的监理工作者,热爱自我的本职工作,有良好的工作作风和吃苦耐劳精神,工作态度严禁,喜欢钻研工程监理中出现问题产生的原因及处理方法,热衷于对工程问题处理方案的积累。
在今后的工作中认真履行自我的岗位职责,要严格按国家规范、以设计图纸为依据实施监理工作。在工作中不断反省自身不足,加强监理业务学习,不断提高自身素质,努力做好监理工作,加强对管理理论知识的学习,灵活多变的处理实际问题,认真完成领导交给的各项工作,努力将自我的专业技术水平提高到一个新的台阶,真正成为一个合格的监理人员。
四、对部门公司的意见和提议
_、提议公司要对不一样的员工进行有针对性的专业培训,多招聘一些有职业资格证书又能独当一面的人才开展工作。
2、提议公司组织具有良好公关本事的人才,并组建成相关部门,应对监理行业的社会化、监理招投标的公开化、复合化。
五、结束语
公司领导的关心支持及工作条件的舒适给了我努力工作的动力,同事间的热情关怀及协作互助给了我工作的舒畅感和踏实感,公司特有的企业文化氛围给了我工作的信心。我坚信自我能够在今后的工作中做的更好,为公司的发展贡献自我的一份力量。
【本文地址:http://www.xuefen.com.cn/zuowen/2324740.html】